Steven was not about to allow the team from Gilsa Construction have all the fun when finishing out the driveway.
At 9 am, Whittlesley delivered 6.5 yards of Santa Fe mix rock, 2-4 inches in size. The truck dumped in the street. Steven shoveled into the pile rock that skittered across the street, making Emerald Hill safe for car traffic, bikers and morning dog walkers. Gilsa shifted the entire pile 20 feet down the street to the foot of the driveway.Gilsa busted the concrete formboards away from the concrete pads — see sledgehammer — and began cutting landscape weedblock cloth to size to cover the exposed roadbase in the drainage channels.Here, the formboards are removed from the two new walkway pads at the front of the house.Neto, left, and Jose, orange shirt, deliver a wheelbarrow laden with rock to the drainage channel off the back corner of the garage.About two hours in, Gilsa is about a half way down the main drainage channel at the long ribbon of driveway that reaches all the way to the street. The team delivered the rocks via wheelbarrow, while Neto kicked the rock into position and Steven, on his knees, moved rock by hand to fill voids.By 4 pm, the center drainage channel is completely rocked.And Jacquela gets first drive on the new driveway.