Category Archives: low-voltage wiring

Punching it

Last week, Ron and Odell from Ranserve walked the house with Steven to organize the punch list.

Two days ago, Odell and Cris began adjusting pocket doors and experimenting with how to fill the holes around the balusters.

Today, Aaron arrived with Chris and Bani to begin working on the kitchen cabinets — smooth edges, filling holes, adjusting drawers and slides. Aaron remeasured for replacement panels.

Above, Chris, left, and Bani, right, adjusting utility drawers between the cooktop and sink.

1-dsc_3678-001Chris arrived from Granite Security to install the glass break sensor missing from the ceiling in Steven’s office — outlined in the black box in photo above.

Chris also added “water bugs” at the washer and both tankless water heaters — sensors that alert us if the washer and heaters overflow.

Chris positioning the water bug at the upstairs tankless water heater.
Chris positioning the water bug at the upstairs tankless water heater.

T minus 7 days

The port-a-potty was taken away five days ago. We’re 24 hours closer to moving in — and Team Ranserve is working through the punch list.

Above … Jacinto from Ranserve today began to scrape the old linoleum tiles off the floor in the old garage. We suspect one of the previous owners converted the garage into a rec room. We want to park the cars and use the space for storage and tools.

Catching up ... the whole-house surge suppressor that the electricians installed a couple of days back -- at the bottom of the electrical panel.
Catching up … the whole-house surge suppressor that the electricians installed a couple of days back — at the bottom of the electrical panel.
Odell chiseled the door frames to fit the strike plates for the deadbolts.
Odell chiseled the door frames to fit the strike plates for the deadbolts.
The painters continue to polish off the house, finishing off the ceiling where the balusters are inserted through the drywall into lumber framing.
The painters continue to polish off the house, finishing off the ceiling where the balusters are inserted through the drywall into lumber framing.
Tyler from Granite Security installs a network wall plate at the TV wall in the family room.
Tyler from Granite Security installs a network wall plate at the TV wall in the family room.
Odell cuts open the back panel of the shelf end of the island, to install an electrical box for the network ports.
Odell cuts open the back panel of the shelf end of the island, to install an electrical box for the network ports.
With Odell done, Tyler snaked the pre-wired Ethernet cable into the new electrical box and punched the wires to the connector.
With Odell done, Tyler snaked the pre-wired Ethernet cable into the new electrical box and punched the wires to the connector.
The connectors on the plug are color coded and labeled, making it easy to match the proper wire.
The connectors on the plug are color coded and labeled, making it easy to match the proper wire.

Notes, 29 Dec. 2015

Above, Granite Security is back on site installing the security system, control hubs, connecting wires to circuit boards. Here’s one of the control pads near the front door, powered!

Shane installs the first door handle set -- on the door to Steven's office.
Shane installs the first door handle set — on the door to Steven’s office.
Cris from Ranserve installed the last panel of what will be Jadin's shower, tensioning it into place with 2x4 lumber. It took a long time to get all the parts on site for what should have been a simple kit with everything stuffed into three or four boxes for shipping.
Cris from Ranserve installed the last panel of what will be Jadin’s shower, tensioning it into place with 2×4 lumber. It took a long time to get all the parts on site for what should have been a simple kit with everything stuffed into three or four boxes for shipping.
Pivot 90 degrees from the shower in Jadin's bath and, cool!, Cris installed the vanity cabinets and bridge storage box.
Pivot 90 degrees from the shower in Jadin’s bath and, cool!, Cris installed the vanity cabinets and bridge storage box.
We used the same configuration -- two vanities with a bridge in the middle -- upstairs in bath 3.
We used the same configuration — two vanities with a bridge in the middle — upstairs in bath 3.
There's a similar configuration in the master bath. These vanities are wider, as is the bridge storage box in the middle.
There’s a similar configuration in the master bath. These vanities are wider, as is the bridge storage box in the middle.

Wrapping up the low-voltage prewire

Chris from Granite Security today finished stringing wire for security, phone, TV and network through Emerald Hill. The last step was to install conduit between points x and y for Steven to pull cables between TVs on the wall and the amplifiers and cable boxes in the closets.

Above, the orange conduit is what Steven will use to pull cables between the TV in the loft and the equipment racked in the electrical closet above the distribution box.

The other end of the pull conduit hanging next to the distribution box in the electrical closet.
The other end of the pull conduit hanging next to the distribution box in the electrical closet.
In the closet downstairs behind the Great Room, Chris installed a second conduit pull.
In the closet downstairs behind the Great Room, Chris installed a second conduit pull.
In the dim light, Chris finishes the prewire by drilling through the plywood backer of TV wall in the Great Room ... not the best shot; the drywall is eating up reflective light and the camera flash was off by a fraction of a second ...
In the dim light, Chris finishes the prewire by drilling through the plywood backer of TV wall in the Great Room … not the best shot; the drywall is eating up reflective light and the camera flash was off by a fraction of a second …
And from the other side of the wall, Chris pushes speaker wire through the hole he just drilled.
And from the other side of the wall, Chris pushes speaker wire through the hole he just drilled.

 

Adventures in structured wiring

Over the past months, Steven has walked the house with multiple installers of structured wiring, also known as low-voltage wiring — network, telephone, audio-visual, security.

It has been a frustrating, disheartening, difficult process that delayed the start of drywall installation by at least two weeks.

Steven takes the blame.

Oversimplifying this miserable saga …

Company #1 walked the house with Steven and Ron, sent the quote to Ranserve, would not communicate with Steven.

Company #2 delivered a quote with touchpads even though Steven specified touchscreens. On the third attempt to get it right, a specialist arrived in a truck, pulled boxes from the back seat, unboxed devices to show Steven — and it still took days to get an updated proposal.

Two installers quit Company #3 and the manager instructed Steven to find someone else to do the job.

Recommended by one of the companies that participates in ShowStoppers press events, Steven walked the house with company #4 days before he departed for Berlin and ShowStoppers @ IFA. The quote arrived in time for Steven to ask questions before leaving for the airport — and during a 50-minute phone call from Berlin. How does dialtone get from the panel in the closet to the jacks in the walls of each room — what distribution module by number and hyperlink and spec goes into the panel? How does Internet signal distribute to the rooms in the house from the panel? Using what module, by hyperlink and specs? “I will have to get you that answer.”

Also recommended by a ShowStoppers company, company #5 could not schedule the install until late September — but referred Steven to another company that could possibly comply with the already-late schedule.

Company #6 missed the count on glass breaks, nailed the network, telephone and AV details, but blew the budget by more than twice the allocated amount.

At this point, Mark and Ron at Ranserve intervened. They scheduled a second meeting with Company #1. Two hours. Walking everything. Talking everything. Speccing everything. The company asked for and received Ranserve permission to communicate directly with Steven. Steven received an updated bid the next day. He reviewed it. Carefully. There were several question. Steven approved it Thursday, 10 September.

Friday, 11 September, Granite Security delivered coils of cable to Emerald Hill and began stringing wire.