Notes, 15 Jan. 2015

Chris from Central Texas Custom Cabinets continues to finish out the kitchen and pantry cabinets.

Steven walked the house today with Elizabeth, who measured for blinds — a candidate supplier; it will all come down to budget.

Ron opened up the drywall behind the mudroom shower -- where the tankless water unit will soon be installed -- to add blocking behind the shower panels. This will enable the plumbers to properly screw the shower head fixture tight to the plastic panels.
Ron opened up the drywall behind the mudroom shower — where the tankless water unit will soon be installed — to add blocking behind the shower panels. This will enable the plumbers to properly screw the shower head fixture tight to the plastic panels.

Ron needs an escutcheon at the pot filler on the backsplash wall. Ron also needs a push-in-pop-out drain for the vanity sink in the mudroom — because there is no room behind the faucet for the pull that would normally open and close the drain in the sink. Ferguson does not carry an escutcheon for the pot filler. Steven went to Lowe’s with a shopping list. He found two candidates for the escutcheon. The drain was out of stock. On a field trip to a second Lowe’s after dinner with Jacquela, he found the only two candidate devices. Ron and the plumbers will now decide which one to install. The loser will go back to Lowe’s.

Leave a Reply