Continuing to punch-list the kitchen

1-dsc_3693Bani, left, and Chris are back, continuing to work through the punch list for the kitchen cabinets. Above, they clamp a new piece of trim under the oven and microwave — one long piece to replace two shorter pieces that failed after the glue gave out.

The utensil storage at the utility drawer between the sink and cooktop is now correctly cut, installed, and functional. Earlier, one of the four stainless steel bins did not fit correctly, due to a hole drilled 1/8 of an inch out of place.
The utensil storage at the utility drawer between the sink and cooktop is now correctly cut, installed, and functional. Earlier, one of the four stainless steel bins did not fit correctly, due to a hole drilled 1/8 of an inch out of place.
Bani and Chris unwrap a replacement cabinet panel.
Bani and Chris unwrap a  cabinet panel. It replaces a similar panel that was defective at manufacture.
Chris screws the replacement panel into position.
Chris screws the replacement panel into position.

 

Leave a Reply