Working the pile

Day 4 at Emerald Hill, currently renamed “Boxland.” We’re working down the pile of to-do.

Above, with help from Chris at Time Warner, the downstairs and upstairs TVs are now operational. Upstairs, we needed component cables — and Chris tweaked the cable box. Downstairs, the Denon amplifier needed a complete system reboot to wipe Sea Eagle from memory. With that, Steven and Chris built new HDMI settings for video and audio via HDMI, with cable box connected in to amp and amp connected out to Panasonic TV. This process is not plug and play. Read the manual, even if it is written in English as a third language. Closed course, professional drivers only. Just in time to watch primary results …

Rene from El Sol Logistics delivered the hanging bags of clothes that somehow stayed with the moving vans — so Steven’s business slacks and shirts are now recovered. Then El Sol transmitted the bill for the rest of the move, after the deposit is deducted. Yich.

But … Rene did take away some of the flattened boxes for re-use by the next family that El Sol moves.

We switched on the air conditioning last night. First time. Ever. There’s record heat in Austin — 91 degrees. Stupifying.

Outside, Victor and Ramon are shoveling down off the driveway the really good black dirt   piled up when Gilsa and Ranserve dug out the foundation for the new garage bay. Here's Ramon late in the afternoon shade, spading deliberately in the record March heat -- 91 degrees.
Outside, Victor and Ramon are shoveling down off the driveway the really good black dirt piled up when Gilsa and Ranserve dug out the foundation for the new garage bay. Here’s Ramon late in the afternoon shade, spading deliberately in the record March heat — 91 degrees.
The dirt comes off the pile in the driveway where we hope to someday park, and is transported by wheelbarrow to the front of the house. Victor and Ramon are building beds around the oaks that will someday receive flowers or ornamental grasses or some other deer-resistant plants. Mulched heavily, the beds cut by nearly a third the front lawn that must be watered and mowed -- which might be worth a point on the Green Build application.
The dirt comes off the pile in the driveway where we hope to someday park, and is transported by wheelbarrow to the front of the house. Victor and Ramon are building beds around the oaks that will someday receive flowers or ornamental grasses or some other deer-resistant plants. Mulched heavily, the beds cut by nearly a third the front lawn that must be watered and mowed — which might be worth a point on the Green Build application.
More of the front of Emerald Hill, with the new bed, with dirt in transport. It's also that time of year that the oaks drop their leaves. Victor blew and raked the leaves into the beds, under the dirt, where the leaves will decompose into fertilizer.
More of the front of Emerald Hill, with the new bed, with dirt in transport. It’s also that time of year that the oaks drop their leaves. Victor blew and raked the leaves into the beds, under the dirt, where the leaves will decompose into fertilizer.

Leave a Reply