Ron Dahlke files this week’s summary report:
This week:
- Completed and passed COA electrical rough inspection
- Started HVAC repairs
- Received some of the shower inserts — one broken, it was reordered, and one still in route
- Replaced yard water line and passed COA inspection
- Sprayed in shower pan liner
- Completed brick pockets at soffits
- Completed brick at front of house
- Received cedar for patio at entry
- Received approval on stairwell materials
- Completed final penetrations through roof
- Confirmed tile measurements
- Ordered 3 step lights from Tracey at Lights Fantastic
- Confirmed front door specs
- Ordered pick up for dumpster full of trash
- Received final exhaust fans
Next week:
- Complete HVAC repairs
- Complete plumbing top out
- Complete stairwell
- Call in COA inspection on above three items
- Cover water yard line
- Install cedar siding at entry
- Roofer scheduled Monday to do repairs
- Send tile measurements to Renee for quote
- Ordered treatment of first floor framing with Better Choice Pest Control for Thursday
- Install daylight drain for utility room
- Insulate behind upstairs tub before installation
- Call in for HVAC duct leakage test with ATS Engineering