The shower pan for bath 2 finally arrived. Custom Plumbing installed it, filled it with water — testing the plumbing.
The tub in bath 3 upstairs has been holding water since it was filled last week. No leaks!After Albert repaired a drain line above the kitchen, the shower pan in the master bath held water all weekend.