9 a.m. Monday morning to talk and walk the week ahead.
Ron Dahlke from Ranserve, left, and Mauricio from Gilsa, right, recovering from his heart attack, meet Steven to plan the concrete pour for the garage foundation. We’re aiming for Thursday, depending on city inspections of forms and steelwork. In front of the house, we plan the pavers that will replace part of the walk to the patio, and the landing in front of the porch. The cardboard on the ground approximates the location and size of the landing. The pavers will extend around the front of the house to the site of the former kitchen deck, which Gilsa has removed via Bobcat. Gilsa will now regrade the ex-deck to ensure water flows away from the side door off the kitchen. And … Gilsa will also regrade behind the garage and enlarge the concrete slab to be used for the HVAC condenser. All this will be consequential toward finishing the house.
Above, an army of 10 painters is sanding down the walls and trim, and taping more protective paper over the stairs and floors, preparing the interior of the house for final painting.
Over the weekend, Aaron from Central Texas Custom Cabinets installed the final box — the small cabinet at the top of the pantry at left of the side kitchen door.Chris from Central Texas Custom Cabinets scribes the “skin” panel that will finish off the end of this run of cabinets at the oven and microwave wall.The skin that finishes the run of cabinets on the refrigerator wall.Upstairs in bath 3, Cris from Ranserve, supervised by his shadow, is rebuilding the drain line to ensure that the emergency cleanout is 8 inches off the floor. That elevation ensures we don’t have to cut up the vanity to get access to the cleanout. Cris will repeat this surgery in the master bath, upstairs, and in bath 2, downstairs. After which, he will patch the drywall, then turn the wall over to the painters for sanding, priming, painting — at which point he will finally be able to install the vanities.