T minus 6 days

Team Ranserve continue working through the punch list as we count down to moving in.

Odell called for the Final Inspection. The inspector arrived. Emerald Hill failed. As expected. This inspector is new to the remodel. He requires more documentation of where the two layers of fire-resistant drywall are and are not installed in the garage, around the mudroom. The previous inspector approved two layers around the mudroom and one layer on the walls that do not connect with the body of the house. Odell is attempting to contact that previous inspector for clarification and resolution.

Above, Julian test fits the 12×12 sheets of 2×2 black tiles that will become the final floor of the master shower. This is how we resolve an issue that has festered since November, when the shower floor was first tiled. The grout lines do not line up. Jacquela objected — the first issue she ever raised on this project. Julian laid out the mosaics. Jacquela arrived to inspect. She approved. Julian is five sheets of tile short. Odell ordered the tile. Now we wait for delivery and install.

Thisi s a mock-up of what the floor will look like when done. Julian left the border on each side open, dry fitting the tile for full sheets to calculate how many more tiles he needs and how much cutting will be required.
Thisi s a mock-up of what the floor will look like when done. Julian left the border on each side open, dry fitting the tile for full sheets to calculate how many more tiles he needs and how much cutting will be required.
In the garage, Odell remounted the fluorescent ceiling lights -- taken down to put up drywall required by the inspector -- and the electricians wired them up again. Odell also trimmed out around the attic hatch.
In the garage, Odell remounted the fluorescent ceiling lights — taken down to put up drywall required by the inspector — and the electricians wired them up again. Odell also trimmed out around the attic hatch.
Jacinto is back for day 2 of scraping up the red linoleum tiles from the garage floor. He reports his shoulders shudder as he falls asleep -- induced from hammering the scraper at the edge of each tile, prying it loose from the glue. Most of the tiles shatter into dried-out shards. Steven attempted to help yesterday. He got up two tiles in five minutes, with a new understanding of physical labor.
Jacinto is back for day 2 of scraping up the red linoleum tiles from the garage floor. He reports his shoulders shudder as he falls asleep — induced from hammering the scraper at the edge of each tile, prying it loose from the glue. Most of the tiles shatter into dried-out shards. Steven attempted to help yesterday. He got up two tiles in five minutes, with a new understanding of physical labor.
At the garage door into the mudroom, and around the door to the back yard, floating the drywall is completed and Odell trimmed out both doors to match the interior trim. He also mounted the garage door openers to the wall -- they were hanging loose before this, waiting for the drywall work to finish.
At the garage door into the mudroom, and around the door to the back yard, floating the drywall is completed and Odell trimmed out both doors to match the interior trim. He also mounted the garage door openers to the wall — they were hanging loose before this, waiting for the drywall work to finish.
Inside the mudroom bath, the wall behind the sink is now patched -- and Odell is again test fitting the drain line and T-trap.
Inside the mudroom bath, the wall behind the sink is now patched — and Odell is again test fitting the drain line and T-trap.

Upstairs in the master bath, Odell discovered that the left-hand medicine cabinet is not centered over the sink faucet; he will take it down and recenter it. He also ordered a replacement for one of the sink faucets, which seems to have developed a permanent slow leak via the cartridge.