It’s taken about a week but the team from Custom Plumbing is, according to Albert, 24-48 hours away from completing rough-in, mapping and installing the basic lines without making the final connections, getting ready for the plumbing inspector.
Everything has been checked with a level as each joint is glued — it’s meticulous work to ensure proper pitch for waste drainage.
Above, a vertiginous look from below at the pipe runs between the ceiling joists and up the wall of what will be bath 3 upstairs.