Saturday morning. Jacquela and Steven visit Emerald Hill.

Above, Jacquela set the correct time on the oven. It’s the only appliance that is powered, so far. Along with the GFCI circuits. The electricians are scheduled to arrive next week to test everything, now that the residential meter is installed and power is delivered to the house.

 

Above, we started in the garage, where the painters have stacked trim lumber in two locations -- moving it all to the side of the new bay, clearing obstructions away from where the garage doors are on schedule to be installed next week. We're also creating storage space -- we hope to start moving in and stacking boxes as Ranserve finishes construction. In the photo above, at left -- painter supplies. Lumber stacked along the back wall of the new bay. Ladders leaning against the pole that helps to support the beam that carries the weight of the new structure where it joins the existing garage. Drywall supplies to the right of the ladders. Old lumber taken out of the back wall of the existing garage when it was removed, stacked here in front of the original two-car garage door for removal by Ron Dahlke, who plans to recycle it. That door is trashed after decades of use, and it will be replaced.
Jacquela and Steven started in the garage, where the painters built two stacks of trim lumber in two locations — blocking everyone’s ability to move easily through the garage. We picked up everything and shifted it all to the side of the new bay, clearing obstructions away from where the garage doors are on schedule to be installed next week. We’re also creating storage space — we hope to start moving in and stacking boxes as Ranserve finishes construction. In the photo above, at left — painter supplies. Lumber stacked along the back wall of the new bay. Ladders leaning against the pole that helps to support the beam that carries the weight of the new structure where it joins the existing garage. Drywall supplies to the right of the ladders. Old lumber taken out of the back wall of the existing garage when it was removed, stacked here in front of the original two-car garage door for removal by Ron Dahlke, who plans to recycle it. That door is trashed after decades of use, and it will be replaced.

David Garcia and his team of painters are pulling up the heavy paper that has protected the floors through construction, sweeping out debris and vacuuming the baseboards, then rolling out new, clean paper. It’s amazing to see the hickory floors exposed, however briefly.

The master bedroom.
The master bedroom.
The loft.
The loft.
Rolling out the new paper to protect the wood floors.
Rolling out the new paper to protect the wood floors.
Late Friday, the team from Gilsa Construction transplanted three bushes to the left side of the house. They were located at the right side, where Gilsa built the new walk. Steven soaked the roots. We'll see if these survive.