Jacquela and Steven spent the weekend packing boxes. There’s a lot more to go. Steven also began taking down Ikea cabinets that will be transplanted to Emerald Hill — and filling holes in the walls with spackling compound.

Today, Steven delivered to Ron Dahlke the short post for the ceiling fan in the family room — Steven pulled and saved a collection of left-over fan parts from ceiling fan cartons — and the transformer and low-voltage puck lights he purchased late Friday from Lights Fantastic. The puck lights will go into the entry-hall display niches.

Ron and Barry from Custom Plumbing today dispatched Steven to a plumbing supply house to purchase one chrome “Tip Toe” finger-press lavatory drain, one chrome slip joint and one chrome P trap — all for use in the mudroom bath. Chrome replaces the white PVC and dresses up the exposed pipe under the sink. The drain solves a problem — it’s impossible to fit between the faucet and wall the conventional pop-up connector rod that you would pull or push to close or open the drain.

Steven also purchased a shower fitting that comes with a thick, round, modern escutcheon. We put the shower connector into the parts bin. Barry, Sean and Noah used the escutcheon to cover the exposed copper pipe behind the pot filler at the backsplash.

Barry, Noah and Sean today began to install the Navian tankless water heaters in the mudroom downstairs and the utility room upstairs. There was drama. The blocking behind the drywall is insufficient. Steven suggested “paneling” the wall with 3/4-inch plywood. Ron and Barry purchased plywood. Genius!

Above, Sean applies fittings to the bottom of the mudroom Navian unit.

Here's the upstairs tankless unit, still boxed, with the alcove where it will mount almost ready. Barry and team will add a sheet of 3/4-inch plywood to help serve as mounting and blocking.
Here’s the upstairs tankless unit, still boxed, with the alcove where it will mount almost ready. Barry and team will add a sheet of 3/4-inch plywood to help serve as mounting and blocking.
Gilsa today began busting the wood forms off the concrete pavers. It's almost more work than pouring the concrete.
Gilsa today began busting the wood forms off the concrete pavers. It’s almost more work than pouring the concrete.

Kris solved solved a mounting problem with the air button at the sink that switches on and off the disposal. Working from underneath, he carved out a wider hole in the undermount stainless steel sink to slide the stem of the air button into, pushing the escutcheon for the air button tight against the quartz countertop.

 