Ron Dahlke is officially placed on medical leave by Ranserve. More details to come.

Above, meet Odell Grant from Ranserve, stepping in to serve as site supervisor as we push to complete the house and move in. Odell is wondering why that hand-made aluminum pan, roughly and not well built, was installed as a drip pan under the tankless water heater, suspended from the copper piping by thin rusted wire. Steven and Jacquela do not approve of this attempt to meet City of Austin codes that require the drip pans. Steven today ordered two replacements from Amazon — one for upstairs, one for down.

Austin Air yesterday completed the startup of the HVAC system. We have heat and air conditioning at Emerald Hill for the first time. The gas furnace is powered up. The condensor could make cold air if we asked it.

The gas meter is hooked up, which is why the furnace and tankless units are able to generate heat and hot water, respectively. But ... there is a distinct smell of escaping gas when Steven took this photo. Odell immediately called the plumbers.
The gas meter is hooked up, which is why the furnace and tankless units are able to generate heat and hot water, respectively. But … there is a distinct smell of escaping gas when Steven took this photo. Odell immediately called the plumbers.

Odell and Steven walked and talked Emerald Hill for about two hours, building a punch list for Odell to work through. He’s helicoptered in to pick up where Ron left off. Deep breath.

About 145 pm Odell reported that the tempered glass needed for the tall window at Jadin’s bedroom will not arrive until Tuesday next week, 1 March. The inspector requires we replace the conventional glass with tempered because a closet door opens toward the window. Safety.

As a result, Odell advises that we push back the move-in date, which was scheduled for Wednesday, 2 March. Steven called Rene de Anda at El Sol Logistics, the moving company. The move is now scheduled for Friday, 11 March.

Cris from Ranserve is working all over the house as Odell and Steven walk and talk. Here, in the master bedroom, Cris is patching the ceiling where we shifted the fan to center of the bed, instead of in the center of the room.
Cris from Ranserve is working all over the house as Odell and Steven walk and talk. Here, in the master bedroom, Cris is patching the ceiling where we shifted the fan to center of the bed, instead of in the center of the room.

Steven ordered Internet, TV and phone services from Time Warner; installation is scheduled for Friday, 26 February.

Leave a Reply