Notes, 17 Nov. 2015

Outside work on the garage is called off because of heavy rain. The crew protected the open pit with plastic before closing up last night. A cold front blew through overnight, dropping the high temperatures into the 60s with an overnight projected in the 40s. Welcome to winter in Austin.

After 5 pm, Julian and his team of tilers arrived to grout the kitchen floor.

The plumbing fixtures are still on schedule for delivery Wednesday/tomorrow.

Leave a Reply