Notes, 15 Oct. 2015

Early start to a busy day.

Above, Steven swept up and collected these “bullets” left behind by Basem as he installed the platforms for the kitchen cabinets. The empty shells have been fired. The shells with tips are still “live ammo” capable of driving the pin nail at right into the concrete slab when hammered with a nail gun. We will not be leaving these lying around.

DSC_4830
Steven arrived at Emerald Hill at 825 am after dropping Jadin off at school. Delivery truck from Ferguson was waiting, with the final missing piece of the shower for bath 2 — Jadin’s bath — the shelf unit that fits into the corner of the shower. Now Ron can finish installing that shower.
Steven continued experimenting with tile layouts. Here is how Jacquela wants the tiles aligned in the kitchen. Steven approves.
Steven continued experimenting with tile layouts. Here is how Jacquela wants the tiles aligned in the kitchen — north/south. Steven approves.
And here is how we will lay out the grid of tiles in bath 2 -- east/west.
And here is how we will lay out the grid of tiles in bath 2 — east/west.

Julian and his crew of tile setters arrived about 9 am. Steven walked the tile patterns and layouts with Julian. One open question is — there are apparently two distinct designs in the tile selected for the kitchen floor. One is linear. The other is mottled. Steven hopes there is enough linear to cover the kitchen floor, and enough mottled to use in the mudroom, mudroom bath and pantry — to help delineate the spaces. We won’t know until Julian opens all the boxes.

Kyle from Cowart arrived about 930 to teach Steven about garage doors. We might be able to save and refurbish the existing door, at several hundred dollars. But it still needs a new motor and remote — Steven is holding out for wi-fi and Internet access to the garage door controls. Kyle reports this can all be packaged with a new door, with full warranty, for about $1,000, total. Steven and Jacquela will continue this conversation Saturday when we meet with Kamla.

Upstairs in the master shower, Pedro applies a second layer of blue waterproofing to the Hardie board.
Upstairs in the master shower, Pedro applies a second layer of blue waterproofing to the Hardie board.
A day or two back, Ron and Cris installed this screen mesh across the exterior of the exhaust vent -- to keep critters and bugs out.
A day or two back, Ron and Cris installed this screen mesh across the exterior of the exhaust vent — to keep critters and bugs out.
More history uncovered and discovered. At some point, the family room at Emerald Hill was carpeted -- and an arc of some other flooring was installed at the back door. Look closely at the gray concrete for the clefts hollowed out in the slab by the nails in the carpet tack.
More history uncovered and discovered. At some point, the family room at Emerald Hill was carpeted — and an arc of some other flooring was installed at the back door. Look closely at the gray concrete for the clefts hollowed out in the slab by the nails in the carpet tack.

Leave a Reply