Notes, 13 Nov. 2015

Above, Shane and Peter are fitting shelves and closet rods. Here’s the downstairs closet at the back of the entry hall.

Upstairs, Shane and Peter are now also trimming out the windows. Steven should have turned on the flash for this photo.
Upstairs, Shane and Peter are now also trimming out the windows. Steven should have turned on the flash for this photo.
The shelf in the closet to bedroom 4 is installed, with the closet rod coming.
The shelf in the closet to bedroom 4 is installed, with the closet rod coming.
Shane built the shelf in the closet to bedroom 3, and trimmed the scuttle to the attic.
Shane built the shelf in the closet to bedroom 3, and trimmed the scuttle to the attic.
Ron Dahlke is beginning to unpack the bathroom sinks, preparing to install these, possibly as early as next week.
Ron Dahlke is beginning to unpack the bathroom sinks, preparing to install these, possibly as early as next week.
Out back, the construction team dug the correct trench for the foundation beam -- the second trench in from the right. The first trench is in the wrong location and needs to be filled back in.
Out back, the construction team dug the correct trench for the foundation beam — the second trench in from the right. The first trench is in the wrong location and needs to be filled back in.