It’s a very big day at Emerald Hill. It’s raining. And the kitchen cabinets are being delivered. The heart of the house.
Above, Chris, left, and Gary, right, unload the delivery van for the second time today. Approximately 1045 am. First delivery took place about 845 am.



The cabinets delivered today are the base cabinets. Upper cabinets and taller cabinets are to be delivered separately, after the base cabinets are screwed into final position.