Kitchen cabinets delivered

It’s a very big day at Emerald Hill. It’s raining. And the kitchen cabinets are being delivered. The heart of the house.

Above, Chris, left, and Gary, right, unload the delivery van for the second time today. Approximately 1045 am. First delivery took place about 845 am.

In the kitchen, Kevin works around the first cabinets delivered, protecting the tile floor with layers of heavy paper.
In the kitchen, Kevin works around the first cabinets delivered, protecting the tile floor with layers of heavy paper.
Chris and Gary carry in another cabinet ...
Chris and Gary carry in another cabinet …
And another.
And another.

The cabinets delivered today are the base cabinets. Upper cabinets and taller cabinets are to be delivered separately, after the base cabinets are screwed into final position.