Just another Monday

Above, Celis hung drywall on two walls in the garage — the front wall closest to the street, and the back wall around the exit door. This should be the final sheets of drywall to go up at Emerald Hill.

Beau, left, and Steve, right, begin installing track lights to the ceiling in the train room.
Beau, left, and Steve, right, begin installing track lights to the ceiling in the train room.

We counted out the runs of track. There are four 8-footers and two 2-footers for the train room. That’s correct. There are four two-footers for the office downstairs. That’s wrong. Tracy at Lights Fantastic stepped through the paperwork to discover the error. Two 8-footers and two 6-footers will be delivered early next week.

Which means … Steve the electrician and Ron are pushing for an electrical inspection tomorrow. The electrical boxes in the office must be populated with lights. Ron advises he will locate temporary fixtures.

Steve the electrician and Ron dispatched Steve for a run to Lowe's, because the lights purchased from Ikea on Saturday for above the vanity in bath 3 will not install properly with the boxes in the wall. Steven purchased two conventional vanity lights and, because it was on sale and might be needed, one LED ceiling light, along with the blank two-gang faceplate that Steve the electrician needs.
Steve the electrician and Ron dispatched Steven for a run to Lowe’s, because the lights purchased from Ikea on Saturday for above the vanity in bath 3 will not install properly with the electrical boxes in the wall. Different shapes. Different sizes. Different wiring schemes. And way too much exposed wire.  At Lowe’s, Steven purchased two conventional vanity lights and, because it was on sale and might be needed, one LED ceiling light, along with the blank two-gang faceplate that Steve the electrician needs.
If the bathroom lights from Ikea will not work, the Striberg LED strips installed perfectly in every closet. Here's a shot from inside Jadin's closet -- two Stribergs connected with a jumper cable, plugged in at the ceiling outlet to one transformer -- per spec.
If the bathroom lights from Ikea will not work, the Striberg LED strips installed perfectly in every closet. Here’s a shot from inside Jadin’s closet — two Stribergs connected with a jumper cable, plugged in at the ceiling outlet to one transformer — per spec.
Shane and Peter apparently put in time at Emerald Hill over the weekend, nailing up the accent lumber on the exposed wall of the stairs. The horizontal joints line up just as planned with each tread.
Shane and Peter apparently put in time at Emerald Hill over the weekend, nailing up the accent lumber on the exposed wall of the stairs. The horizontal joints line up just as planned with each tread.

Leave a Reply