How to not cut structure when remodeling a bath, continued …

DSC_9958With insulation removed it’s now possible to see just how badly the structure was cut when the upstairs bathrooms were remodeled sometime during the life of this house.

At left, the blocking was turned sideways and cut to shreds. At right, the blocking was cut by half. In the middle, the blocking is, well, holed beyond integrity. And the ceiling beams are compromised.

Building code today prohibits this.

Steven is thinking that taking the house down to stud is a smart decision.