Less than two weeks in the house, the main drain line for the house plugged and backed up and flooded the mudroom bath with less than two weeks of, let’s use an apt euphemism, crap.
It took more than a day to find the main cleanout for the house. It was buried almost two feet down in front of the house, between what is Steven’s office and the front porch.
Steven contends the cleanout should have been located at the start of remodeling. Steven believes the main line was blocked, in part, by construction debris.
Steven and Mark from Ranserve met today with Barry the plumber, attempting to resolve the four-digit bill for this disaster.
The plumber accepts no responsibility.
Mark and Steven resolve to move on.