First floor demo as of 17 June 2015

The bulk of demo on the first floor is done, paused for inspection later this week by the structural engineer.

Here’s what it looks like.

Standing in what will be Steven's office, looking at what will be the library/dining room to the left, kitchen to the right, and family room beyond.
Standing in what will be Steven’s office, looking at what will be the library/dining room to the left, kitchen to the right, and family room beyond. Steven’s backpack on the floor. Insulation removed from ceiling, HVAC ducts still in place.
A preview of the demo that is now underway upstairs -- insulation falling to the floor at the stairs and front entry.
A preview of the demo that is now underway upstairs — insulation falling to the floor at the stairs and front entry.
The cast-iron bathtub in what will become bath 2. Ron and Steven discussed the possibility of trying to remove this intact. It's not possible. It has to be cut and smashed out.
The cast-iron bathtub in what will become bath 2. Ron and Steven discussed the possibility of trying to remove this intact. It’s not possible. It has to be cut and smashed out.
Standing in what will be bedroom 2 looking back at the insulation from the second floor falling down the stairs as demo continues.
Standing in what will be bedroom 2 looking back at the insulation from the second floor falling down the stairs as demo continues.