Electricians, painters, cabinetmakers, tilers, carpenters

48 hours since Steven last visited Emerald Hill, the electricians, painters, cabinetmakers, tilers and carpenters are transforming the house.

Let’s catch up.

Above, the electricians are starting to install light switches. Here’s a bank of switches in the master suite. Can’t. Wait. To. Turn. On. Lights!

Look up at the ceiling. Many of the 6-inch and 4-inch LED recessed lights are installed throughout Emerald Hill. Here's the ceiling over the kitchen island and into the family room. Look down. Randy has installed four of the five island cabinets -- and he's working at left on the pantry storage that will be next to the refrigerator. Look at the lumber rack near the back of the photo. It's empty, because ...
Look up at the ceiling. Many of the 6-inch and 4-inch LED recessed lights are installed throughout Emerald Hill. Here’s the ceiling over the kitchen island and into the family room. Look down. Randy has installed four of the five island cabinets — and he’s working at left on the pantry storage that will be next to the refrigerator. Look at the lumber rack near the back of the photo. It’s empty, because …
The painters have turned the back yard into a spray booth, priming all the trim wood before installation by the carpenters.
The painters have turned the back yard into a spray booth, priming all the trim wood before installation by the carpenters.
Ron and Cris from Ranserve waterproofed the walls of what will be Jadin's shower in bath 2.
Ron and Cris from Ranserve waterproofed the walls of what will be Jadin’s shower in bath 2.
The tilers are sealing the floor in the master shower and bath. By end of day, the floors in bath 2, bath 3 and the utility room will also be sealed.
The tilers are grouting the floor in the master shower and bath. By end of day, the floors in bath 2, bath 3 and the utility room will also be grouted.
Here's the master shower, tiled and sealed, with the gray quartz shelf cemented into place and the linear drain protected with blue painter's tape.
Here’s the master shower, tiled and grouted, with the gray quartz shelf cemented into place and the linear drain protected with blue painter’s tape.
This is a smoke alarm or CO2 detector -- won't know until the electricians take off the protective tape -- in the hallway of the master suite.
This is a smoke alarm or CO2 detector — won’t know until the electricians take off the protective tape — in the hallway of the master suite.
Back downstairs in the kitchen, Aaron, left, and Randy, right, talk through installation of the shelf cabinet at the far end of the kitchen island. The cabinet is square to the other island cabinets -- but we discover that the tile floor is about 1/2-inch out of square because the house is not perfectly linear. Ron Dahlke asks Julian to trim the tiles with a special saw. In turn, that will allow the flooring company to come in in about a month to properly lay the hickory flooring square to the cabinets.
Back downstairs in the kitchen, Aaron, left, and Randy, right, talk through installation of the shelf cabinet at the far end of the kitchen island. The cabinet is square to the other island cabinets — but we discover that the tile floor is about 1/2-inch out of square because the house is not perfectly linear. Ron Dahlke asks Julian to trim the tiles with a special saw. In turn, that will allow the flooring company to come in in about a month to properly lay the hickory flooring square to the cabinets.
Aaron test fits one of the Ikea handles on a cabinet drawer. Yes, it fits and will do the job we ask of it. Minimal. Linear. Functional.
Aaron test fits one of the Ikea handles on a cabinet drawer. Yes, it fits and will do the job we ask of it. Minimal. Linear. Functional.
In the entry hall, Aaron and Ron plot how the stairs will meet the low bench at the stair landing. The bench will include storage for shoes, bags, books and other items -- an arrangement suggested by homes in Japan that Jacquela, Jadin and Steven visited.
In the entry hall, Aaron and Ron plot how the stairs will meet the low bench at the stair landing. The bench will include storage for shoes, bags, books and other items — an arrangement suggested by homes in Japan that Jacquela, Jadin and Steven visited.

Not photographed …

  • Ron, Michelle and Steven talked through the garage project and budget. We’re getting there. More to come.
  • BMC delivered the attic ladder.
  • Austin Stone is scheduled to measure Thursday, 29 October, for kitchen countertops.
  • Harway reports delivery of the induction cooktop to the warehouse. It will arrive Wednesday, 28 October, at Emerald Hill.
  • Jacquela and Steven selected the red grout to go with the red glass tiles at the kitchen backsplash — Stainmaster Red.