Befores / Afters

The exterior of the kitchen wall as of 22 July 2015.
The exterior of the kitchen wall as of 22 July 2015.

Yesterday, the brick exterior wall at the back of the kitchen was cut open for the new, larger window over the kitchen sink — and the original sliding glass door was still in place.

Same wall, 24 hours later. The new office window to the left, the new kitchen window to the right.
Same wall, 24 hours later. The new office window to the left, the new kitchen window to the right.

Today, the framing crew cut open the wall to add the new window to Steven’s office, and then mounted the new office and kitchen windows into place.

New window on the left was a brick wall yesterday.
New window on the left was a brick wall yesterday.

Here’s the new window in the office, from inside the office. More light!

The sliding glass door is removed from the back wall of the kitchen, and concrete mixed to create a new footing.
The sliding glass door is removed from the back wall of the kitchen, and concrete mixed to create a new footing.

And the sliding glass door has been removed. The brick wall here will be extended to the right, toward the garage. A new 36-inch wide exterior door will slot into the corner with the garage.

The original sliding glass door from the kitchen.
The original sliding glass door from the kitchen. With Steven’s backpack sitting guard.

Here is the sliding glass door, removed, ready for donation to Habitat.