Bathroom fixtures, day 1

Ferguson delivered some of the bath and tub shower kits. Barry and Albert from Custom Plumbing unboxed the parts.

The shower pan for bath 2 is cracked. Ferguson will need to expedite a replacement.
The shower pan for bath 2 is cracked. Ferguson will need to expedite a replacement.
With the shower pan already cemented into place, Barry, at right, positions the rear shower wall while Albert  calls out flange locations.
With the shower pan already cemented into place, Barry, at right, positions the rear shower wall while Albert calls out flange locations.
Albert screws the back wall to a stud.
Albert screws the back wall to a stud.
Upstairs, the plumbing team wrestled the tub into place in bath 3.
Upstairs, the plumbing team wrestled the tub into place in bath 3.