Ferguson delivered some of the bath and tub shower kits. Barry and Albert from Custom Plumbing unboxed the parts.
The shower pan for bath 2 is cracked. Ferguson will need to expedite a replacement.With the shower pan already cemented into place, Barry, at right, positions the rear shower wall while Albert calls out flange locations.Albert screws the back wall to a stud.Upstairs, the plumbing team wrestled the tub into place in bath 3.