Above, Cris from Ranserve finished hanging plywood on the walls of what will be the library/dining room — both side walls. Drywall will cover the plywood. Steven will use the plywood backing behind the drywall to support bookshelves.
Look how clean this room is — swept, with no building supplies and brick rubble laid out on the floor!
Kevin Rehberg, apprentice builder, son of Mark, the president of Ranserve, the builder at Emerald Hill — Kevin cleaned up the house after an intense week with framers, plumbers, electricians, HVAC and other teams working in the house, quality-control inspections, and multiple deliveries. The house looks superb. The floors are swept. Lumber is piled neatly. Shattered brick is shoveled out to the boneyard. All the HVAC peel-and-stick trash is gone. This attention to detail should not go unremarked, unrecognized.
