In the 30 November installment of the sprinkler saga, Mikel from Green Tree Professional returned to continue resurrecting the sprinkler system from construction damage. He blocked six hours, believing most if not all of the damage was already identified and repaired. His goal was to begin redesigning the system to cut off lateral lines and sprinkler heads along the front of the house where planting beds no longer exist, and to lay out new drip lines to water the oaks in the front yard and planting beds that will be added to Emerald Hill.







With the driplines laid out and staked down, Mikel switched on the water and activated the zones at the controller, to test the system.
He discovered a broken line that no one knew existed at the end of the new fence line up the driveway. Water streamed from a severed lateral line that was buried under several inches of mulch. He extracted from under the mulch a brass spigot attached to what was the end of the severed pipe. Mikel cut the pipe clean and capped it.
With that line fixed, Mikel switched the system back on — and there was now enough water pressure in the line to reveal four sprinkler heads buried under the mulch around the oaks behind the new fence. He removed the heads and capped the line. And … if we had known this run of sprinklers existed, he could have used it to supply the dripline around the trees — coulda woulda shoulda but too late now.

To be continued …