To solve the unbalanced lights above the island, Ron Dahlke suggested adding a fourth ceiling can. Steven approved.
Ron and Steve from Capstone Electric today repositioned the middle of the existing three cans, then installed a fourth can — all carefully measured to ensure the pairs are equidistant from each other.
Tomorrow, Ron plans to align the four cans in a straight line, then put the drywall back up on the ceiling.