Moving stuff in — doors and trim

“We have reached that point in this renovation where we are moving stuff in, instead of taking stuff out,” said Ron Dahlke, talking with Steven today about what comes next.

Deliveries today from BMC West include the first interior doors and the baseboard, casing and other trim materials that the carpenters will soon install.

Above, about half the interior doors have arrived, stacked in the kitchen.

BMC built this neat rack to store baseboard, casing and other trim lumber.
BMC built this neat rack to store baseboard, casing and other trim lumber.
Ron supervises while Cris navigates a closet door through the hallway to bedroom 1.
Ron supervises while Cris navigates a closet door through the hallway to bedroom 1.
One door jamb arrived splintered and will need to be replaced.
One door jamb arrived splintered and will need to be replaced.

Leave a Reply