Ground Control to Major Tom

David Bowie, 1947-2016. “Check ignition and may God’s love be with you.”

Commencing countdown, engines on …

Welcome to the Monday launch window at Emerald Hill. Ron and Steven set aside time this day to walk the house together for the first time since Steven returned from ShowStoppers @ CES in Vegas. That was the plan. We did work through a long list of open items — garage lights, framing, electrical, plumbing, pending inspections, drywall seams opening up, why the drywall is cut open in several locations.

10 …

Then the install crew for the countertops arrived.

9 …

At first, Miguel, Saul and Luis buzzed through the to-do list.

They mounted the undermount sinks in the master bath to the countertop with silicon and screws, trimmed the 4-inch deep gray quartz shelf to length and glued it into position behind the vanity ...
8 … They mounted the undermount sinks in the master bath to the countertop with silicon and screws, trimmed the 4-inch deep gray quartz shelf to length and glued it into position behind the vanity …
They mounted the sinks in bathroom 3 upstairs ...
7 … They mounted the sinks in bathroom 3 upstairs …

6. Ron left Emerald Hill for a meeting …

They came back to the master bath to install the gray quartz backsplash ...
5 … They came back to the master bath to install the gray quartz backsplash …

4. Matt from Ranserve removed the protective foam from the island countertop …

3. They slid the 5x10-foot slab of quartz off the base cabinets while Matt, at right, watched ...
3. They slid the 5×10-foot slab of quartz off the base cabinets while Matt, at right, watched …

2. They carried into the kitchen the custom-made L-shaped steel support brackets that the countertop maker requires we use to support the quartz as it bridges the two ends of the island …

1.  Miguel and Steven talked in great detail through how to mount the brackets, where to mount the brackets …

Now it’s time to leave the capsule if you dare …

Saul routes into the cabinet a wider channel to seat the bracket into while Miguel preps ... the wide
Saul routes into the cabinet a wider channel to seat the bracket into while Miguel preps the undermount bracket at the east side of the island. Plans call for 4 brackets spaced across the width of the island, to disperse and support the quartz, protecting it from collapse and breaking. 

And the stars look very different today …

Steven stepped out of the kitchen to talk with the structural engineer inspecting the garage framing, came back into the kitchen, and stopped the work.

Your circuit’s dead, there’s something wrong …

This is the cut to the cabinet where Steven stopped the adventure.
The install team sliced into the shelf cabinet at the end of the island — and through the cabinet. This is the cut to the cabinet where Steven stopped the adventure.
This is the slice from underneath.
This is the slice from underneath.

Can you hear me, Major Tom?

Steven called Ron. Twice. Texted a photo of the damaged cabinet. 30 minutes went by. Ron called in from his truck, 20 minutes out from Emerald Hill. We waited. MIguel called Austin Stone, supplier of the countertop. Ron arrived. He put the bracket install on hold pending inspection of the cabinets by Aaron, the cabinetmaker, aiming at tomorrow/Tuesday.

In the interim, the install team removed the brackets, placed the countertop back atop the base cabinets.

Here am I floating ’round my tin can …

Next, working with Ron and Steve the electrician, Steven and Miguel measured precisely where to locate the Haefele electrical outlet that will pop up through a hole in the countertop slab. Steve the electrician doublechecked the outlet and electrical supply. We measured one position five or six times. Steven walked around it, thinking, testing the length of the reach from the end of the island. Too far. We shifted it closer to the end. Steven approved. We triplechecked the position. Again. Steven approved it. Again.

Miguel drills the countertop for the electrical outlet while Luis suctions away quartz dust.
Miguel drills the countertop for the electrical outlet while Luis suctions away quartz dust.

Which is when Steven left, making sure that Ron would continue to supervise.

And there’s nothing I can do …

Leave a Reply