Notes, 28 Jan. 2016

Inside the house, Shane and Peter are carving up pocket doors to install hardware — plus towel bars, toilet paper holders, floor and wall stops, and more.

Outside, David Garcia and his team of painters are priming the back of the new garage structure — bright white.

But … in front, the first coat of barn red exterior paint is up. Perfect!

David, at left, on the ground, with roller, at the back of the garage structure, painting primer, with team.
David, at left, on the ground, with roller, at the back of the garage structure, painting primer, with team.
At the rear of the garage, Gilsa is regrading the dirt to ensure water runs off away from the garage foundation. This entire strip of bare dirt will be covered with weed block fabric and then black gravel.
At the rear of the garage, Gilsa is regrading the dirt to ensure water runs off away from the garage foundation. This entire strip of bare dirt will be covered with weed block fabric and then black gravel.
Share. Link. Like.

Meter in, power on

It’s a very big milestone day at Emerald Hill. Austin Energy installed the residential meter early this morning. Power is on, inside the house, routed through the breaker box. Capstone Electric has to come out to test all the circuits.

Above, the oven control panel is alive, powered, for the first time.

Here's the meter, installed, with bar codes obscured.
Here’s the meter, installed, with bar codes obscured.
Share. Link. Like.